Flat Inspection Checklist Before Possession: 30-Point Snag List for Pune Buyers

Buyer guide

By AB Housing Admin

Quick answer

A flat inspection before possession is a 30-point walkthrough of documents, structure, doors, windows, plumbing, electricals, finishes and common areas, recorded with dated photos and signed by both parties. Verify the Occupancy Certificate first and record every defect in a joint possession memo.

A flat inspection before possession is a 30-point walkthrough of documents, structure, doors, windows, plumbing, electricals, finishes and common areas, recorded with dated photos and signed by both parties. Do not take keys until the Occupancy Certificate is verified and every defect is listed in the possession memo. In Pune and PCMC, builders generally ask for 30 days to cure snags, so the quality of your list decides how quickly your home is fixed.

Quick answer: Carry a 30-point snag list to possession: verify the OC, fire NOC, agreement plan and MahaRERA entry first, then check walls, doors, windows, wiring, water pressure, drainage and finishes room by room. Photograph every defect, get a joint signed list, and do not sign a blank possession memo. Ask for a written 7-to-30-day rectification timeline before you accept keys.

Possession coming up? Get the checklist before you sign

Tell us your project and tower. Our team will share the checklist format and the questions to ask at handover.

Enquire now → View project details

Documents to verify before you step inside

The physical inspection is only half the job. Start with paperwork, because a defect in the approvals cannot be fixed with a coat of paint.

  1. Occupancy Certificate: ask for the OC for your exact tower and phase. A Completion Certificate alone does not permit you to live in the building.
  2. Fire NOC and completion drawings: check that the fire clearance is current and that the drawing set matches the building you are standing in.
  3. Agreement versus built flat: compare carpet area, room layout and wall positions with the sanctioned plan attached to your agreement.
  4. MahaRERA portal entry: confirm that your tower and flat number appear in the registered project and that the promoter name matches your agreement.
  5. Final demand note: reconcile GST, stamp duty, registration and pending dues against receipts before you pay anything at handover.

The 30-point snag list

Use this as a printed or digital checklist. Mark each row pass, fail or not visible, and add a photo reference number for every fail.

ZoneWhat to checkExample of a defect
DocumentsOccupancy Certificate for the exact tower and phaseOC shown for a different tower or phase
DocumentsFire NOC and completion drawing setCertificate expired or document not produced
DocumentsAgreement plan matched with the built flatWall shifted or room size visibly reduced
DocumentsMahaRERA registration entry for your towerFlat not listed in the registered tower
DocumentsFinal demand note with all dues reconciledBuilder asks for an unstated charge at possession
StructureWall alignment and plaster lineWall out of plumb or a visible crack
StructureCeiling height and slab finishLower than promised or uneven slab
StructureDamp patches near bathrooms and external wallsWater seepage or fresh paint over a stain
StructureFloor level across all roomsSloping floor or hollow sound when tapped
StructureStructural crack width and locationHairline crack widened or running through a beam
Doors & windowsMain door frame, latch and finishMisaligned frame or a cheaper door than shown
Doors & windowsInternal doors and hingesDoors do not latch or hinges already loose
Doors & windowsWindow frames and sealantScratched aluminium or gaps in the sealant
Doors & windowsGlass panes, mesh and shuttersCracked pane, wrong tint or missing mesh
Doors & windowsBalcony railing and handrailWobbly railing or incomplete weld
ElectricalSwitchboard make, count and alignmentLoose switches or a different brand
ElectricalPoint count against the approved planFewer points than the plan promises
ElectricalEarthing and MCB distributionNo earthing or a shared MCB
ElectricalLight, fan and exhaust pointsNo point in the kitchen or bathroom
ElectricalMeter and permanent wiringTemporary wiring or meter not yet installed
PlumbingWater pressure at your floorWeak flow, especially on an upper floor
PlumbingLeak test under sinks and behind toiletsDripping joint or damp wall
PlumbingBathroom drainage slopeWater stagnates instead of reaching the drain
PlumbingSanitary fittings and tapsChipped ceramic or a leaking tap
PlumbingOverhead tank and sump connectionTank not connected or sump lid missing
FinishesPaint and plaster finishPatchy paint or flaking in corners
FinishesFloor and wall tilesHollow tiles or uneven grout lines
FinishesKitchen platform and backsplashScratched granite or missing backsplash
FinishesBuilt-ins promised in the agreementWardrobe or shelf not provided
Common areasLift, lobby, corridor and garbage chuteLift down, lobby unfinished or chute missing

How to record snags so they actually get fixed

  1. Walk the flat room by room in daylight. Photograph and short-video each defect with a date stamp and a clear view of the location.
  2. Number the photos to match the checklist rows. A list that says "bathroom problem" without a photo is easy to ignore.
  3. Ask the site engineer to walk with you and countersign the list. A joint list is far stronger than a one-sided email.
  4. Email the signed list to the official project email ID the same day and keep the delivery receipt.
  5. Do not sign a blank possession memo or a "no dues, no defects" declaration while snags are open. Write " possession taken under protest, snag list attached" if you must sign.

The 7-day and 30-day rectification process

StageWhat happensYour action
Day 0Joint walkthrough and snag listPhotograph, sign and email the list
Day 1-7Builder usually starts minor fixesSend one reminder in writing if there is no response
Day 8-30Major defects such as leakage or wiring are addressedAsk for a written status note on each open item
Day 30Reinspection and closureSign closure only for items you have personally verified
After 30 daysUnresolved defects are escalatedFile a complaint on MahaRERA portal with the agreement, snag list and photos

Red flags that should stop you from taking keys

  1. No Occupancy Certificate for your tower, or an OC for a different phase.
  2. Water seepage on a structural wall or a ceiling with a fresh paint patch over a stain.
  3. Hollow tiles across multiple rooms, which usually means poor bedding and early cracking.
  4. No earthing, temporary wiring or a switchboard that does not match the approved plan.
  5. A demand for extra charges at possession with no receipt or written justification.
  6. Your flat or tower is not visible in the MahaRERA registration details.

What if the builder refuses to fix the snags?

Send a final written notice with the snag list, photos and a reasonable deadline. If there is still no response, register a complaint on the MahaRERA portal with your agreement, payment receipts and the joint list. Keep every payment record: the regulator can direct the promoter to complete pending work, but it needs evidence. For the broader decision between an under-construction flat and a ready home, read our under-construction vs ready-to-move guide.

Want a second pair of eyes at handover?

Share your project name and possession timeline. We will connect you with the right questions and document checks.

Enquire now → View project details

Our research note

AB Housing Realty compiled this checklist from standard possession practice for Pune and PCMC residential projects. Timelines such as 7 and 30 days are typical builder commitments, not statutory guarantees; the agreement and the MahaRERA registration are the controlling documents. Verify all approvals, areas and charges in writing before you sign the possession memo.

FAQs

Frequently asked questions

What is a snag list?

A snag list is a written record of defects and incomplete work in your flat, prepared at handover and signed by both the buyer and the builder. It protects you after possession. Read the related AB Housing guide →

When should I inspect my flat?

Inspect before you accept keys and sign the possession memo. Once you sign a clean possession note, proving that a defect existed at handover becomes much harder. Read the related AB Housing guide →

Can I refuse possession if snags remain?

You can decline to sign a clean possession memo and ask for a reinspection date. Refusing keys altogether has loan, rent and possession-timeline consequences, so get written advice first. Read the related AB Housing guide →

Which documents must I check first?

Check the Occupancy Certificate for your tower, fire NOC, agreement plan, MahaRERA entry and the final demand note with receipts before you look at paint or tiles. Read the related AB Housing guide →

How many photos should I take?

Take at least one photo per defect and a short video of larger issues such as seepage or hollow tiles. Number them to match your checklist rows and keep the originals with a date stamp. Read the related AB Housing guide →

Who should sign the snag list?

You and the builder representative or site engineer should both sign and date it. Email the signed copy to the official project address on the same day. Read the related AB Housing guide →

How long does a builder get to fix defects?

Many builders commit to 7 days for minor work and up to 30 days for larger defects, but the agreement controls. Ask for the timeline in writing at handover. Read the related AB Housing guide →

What is the difference between snags and structural defects?

Snags are finishes and small items such as a loose switch. Structural defects involve walls, slabs or waterproofing and need a more formal written complaint and inspection. Read the related AB Housing guide →

Verified projects

Projects covered in this guide

Verification & provenance

Sources: Standard possession practice compiled by AB Housing Realty; MahaRERA portal https://maharera.mahaonline.gov.in/ is the primary verification source for project registration and promoter details.

Claim check: Checklist items and 7/30-day timelines are indicative industry practice, not statutory guarantees. Verify the OC, fire NOC, agreement plan, floor area, charges and registration entry in writing before signing the possession memo.

Last reviewed