Quick answer
A flat inspection before possession is a 30-point walkthrough of documents, structure, doors, windows, plumbing, electricals, finishes and common areas, recorded with dated photos and signed by both parties. Verify the Occupancy Certificate first and record every defect in a joint possession memo.
A flat inspection before possession is a 30-point walkthrough of documents, structure, doors, windows, plumbing, electricals, finishes and common areas, recorded with dated photos and signed by both parties. Do not take keys until the Occupancy Certificate is verified and every defect is listed in the possession memo. In Pune and PCMC, builders generally ask for 30 days to cure snags, so the quality of your list decides how quickly your home is fixed.
Quick answer: Carry a 30-point snag list to possession: verify the OC, fire NOC, agreement plan and MahaRERA entry first, then check walls, doors, windows, wiring, water pressure, drainage and finishes room by room. Photograph every defect, get a joint signed list, and do not sign a blank possession memo. Ask for a written 7-to-30-day rectification timeline before you accept keys.
Possession coming up? Get the checklist before you sign
Tell us your project and tower. Our team will share the checklist format and the questions to ask at handover.
Documents to verify before you step inside
The physical inspection is only half the job. Start with paperwork, because a defect in the approvals cannot be fixed with a coat of paint.
- Occupancy Certificate: ask for the OC for your exact tower and phase. A Completion Certificate alone does not permit you to live in the building.
- Fire NOC and completion drawings: check that the fire clearance is current and that the drawing set matches the building you are standing in.
- Agreement versus built flat: compare carpet area, room layout and wall positions with the sanctioned plan attached to your agreement.
- MahaRERA portal entry: confirm that your tower and flat number appear in the registered project and that the promoter name matches your agreement.
- Final demand note: reconcile GST, stamp duty, registration and pending dues against receipts before you pay anything at handover.
The 30-point snag list
Use this as a printed or digital checklist. Mark each row pass, fail or not visible, and add a photo reference number for every fail.
| Zone | What to check | Example of a defect |
|---|---|---|
| Documents | Occupancy Certificate for the exact tower and phase | OC shown for a different tower or phase |
| Documents | Fire NOC and completion drawing set | Certificate expired or document not produced |
| Documents | Agreement plan matched with the built flat | Wall shifted or room size visibly reduced |
| Documents | MahaRERA registration entry for your tower | Flat not listed in the registered tower |
| Documents | Final demand note with all dues reconciled | Builder asks for an unstated charge at possession |
| Structure | Wall alignment and plaster line | Wall out of plumb or a visible crack |
| Structure | Ceiling height and slab finish | Lower than promised or uneven slab |
| Structure | Damp patches near bathrooms and external walls | Water seepage or fresh paint over a stain |
| Structure | Floor level across all rooms | Sloping floor or hollow sound when tapped |
| Structure | Structural crack width and location | Hairline crack widened or running through a beam |
| Doors & windows | Main door frame, latch and finish | Misaligned frame or a cheaper door than shown |
| Doors & windows | Internal doors and hinges | Doors do not latch or hinges already loose |
| Doors & windows | Window frames and sealant | Scratched aluminium or gaps in the sealant |
| Doors & windows | Glass panes, mesh and shutters | Cracked pane, wrong tint or missing mesh |
| Doors & windows | Balcony railing and handrail | Wobbly railing or incomplete weld |
| Electrical | Switchboard make, count and alignment | Loose switches or a different brand |
| Electrical | Point count against the approved plan | Fewer points than the plan promises |
| Electrical | Earthing and MCB distribution | No earthing or a shared MCB |
| Electrical | Light, fan and exhaust points | No point in the kitchen or bathroom |
| Electrical | Meter and permanent wiring | Temporary wiring or meter not yet installed |
| Plumbing | Water pressure at your floor | Weak flow, especially on an upper floor |
| Plumbing | Leak test under sinks and behind toilets | Dripping joint or damp wall |
| Plumbing | Bathroom drainage slope | Water stagnates instead of reaching the drain |
| Plumbing | Sanitary fittings and taps | Chipped ceramic or a leaking tap |
| Plumbing | Overhead tank and sump connection | Tank not connected or sump lid missing |
| Finishes | Paint and plaster finish | Patchy paint or flaking in corners |
| Finishes | Floor and wall tiles | Hollow tiles or uneven grout lines |
| Finishes | Kitchen platform and backsplash | Scratched granite or missing backsplash |
| Finishes | Built-ins promised in the agreement | Wardrobe or shelf not provided |
| Common areas | Lift, lobby, corridor and garbage chute | Lift down, lobby unfinished or chute missing |
How to record snags so they actually get fixed
- Walk the flat room by room in daylight. Photograph and short-video each defect with a date stamp and a clear view of the location.
- Number the photos to match the checklist rows. A list that says "bathroom problem" without a photo is easy to ignore.
- Ask the site engineer to walk with you and countersign the list. A joint list is far stronger than a one-sided email.
- Email the signed list to the official project email ID the same day and keep the delivery receipt.
- Do not sign a blank possession memo or a "no dues, no defects" declaration while snags are open. Write " possession taken under protest, snag list attached" if you must sign.
The 7-day and 30-day rectification process
| Stage | What happens | Your action |
|---|---|---|
| Day 0 | Joint walkthrough and snag list | Photograph, sign and email the list |
| Day 1-7 | Builder usually starts minor fixes | Send one reminder in writing if there is no response |
| Day 8-30 | Major defects such as leakage or wiring are addressed | Ask for a written status note on each open item |
| Day 30 | Reinspection and closure | Sign closure only for items you have personally verified |
| After 30 days | Unresolved defects are escalated | File a complaint on MahaRERA portal with the agreement, snag list and photos |
Red flags that should stop you from taking keys
- No Occupancy Certificate for your tower, or an OC for a different phase.
- Water seepage on a structural wall or a ceiling with a fresh paint patch over a stain.
- Hollow tiles across multiple rooms, which usually means poor bedding and early cracking.
- No earthing, temporary wiring or a switchboard that does not match the approved plan.
- A demand for extra charges at possession with no receipt or written justification.
- Your flat or tower is not visible in the MahaRERA registration details.
What if the builder refuses to fix the snags?
Send a final written notice with the snag list, photos and a reasonable deadline. If there is still no response, register a complaint on the MahaRERA portal with your agreement, payment receipts and the joint list. Keep every payment record: the regulator can direct the promoter to complete pending work, but it needs evidence. For the broader decision between an under-construction flat and a ready home, read our under-construction vs ready-to-move guide.
Want a second pair of eyes at handover?
Share your project name and possession timeline. We will connect you with the right questions and document checks.
Our research note
AB Housing Realty compiled this checklist from standard possession practice for Pune and PCMC residential projects. Timelines such as 7 and 30 days are typical builder commitments, not statutory guarantees; the agreement and the MahaRERA registration are the controlling documents. Verify all approvals, areas and charges in writing before you sign the possession memo.
FAQs
Frequently asked questions
What is a snag list?
A snag list is a written record of defects and incomplete work in your flat, prepared at handover and signed by both the buyer and the builder. It protects you after possession. Read the related AB Housing guide →
When should I inspect my flat?
Inspect before you accept keys and sign the possession memo. Once you sign a clean possession note, proving that a defect existed at handover becomes much harder. Read the related AB Housing guide →
Can I refuse possession if snags remain?
You can decline to sign a clean possession memo and ask for a reinspection date. Refusing keys altogether has loan, rent and possession-timeline consequences, so get written advice first. Read the related AB Housing guide →
Which documents must I check first?
Check the Occupancy Certificate for your tower, fire NOC, agreement plan, MahaRERA entry and the final demand note with receipts before you look at paint or tiles. Read the related AB Housing guide →
How many photos should I take?
Take at least one photo per defect and a short video of larger issues such as seepage or hollow tiles. Number them to match your checklist rows and keep the originals with a date stamp. Read the related AB Housing guide →
Who should sign the snag list?
You and the builder representative or site engineer should both sign and date it. Email the signed copy to the official project address on the same day. Read the related AB Housing guide →
How long does a builder get to fix defects?
Many builders commit to 7 days for minor work and up to 30 days for larger defects, but the agreement controls. Ask for the timeline in writing at handover. Read the related AB Housing guide →
What is the difference between snags and structural defects?
Snags are finishes and small items such as a loose switch. Structural defects involve walls, slabs or waterproofing and need a more formal written complaint and inspection. Read the related AB Housing guide →
Verified projects
Projects covered in this guide
Lodha Group
Lodha Wakad Pre-Launch, Kasturi Chowk
Wakad, Pune
₹22,000,000
starting3 BHK · 3.5 BHK · Penthouse
Ad · Verified project — sponsored
MahaRERA PR1260002602193
ANP Corp
ANP Corp New Launch Wakad (Coming Soon)
Wakad, Pune
₹11,000,000
starting2 BHK · 3 BHK
MahaRERA Coming Soon
Jhamtani Group
Jhamtani Gateway of Europe - Charholi
Charholi, Pune
₹6,000,000
starting2 BHK · 3 BHK
MahaRERA -
Verification & provenance
Sources: Standard possession practice compiled by AB Housing Realty; MahaRERA portal https://maharera.mahaonline.gov.in/ is the primary verification source for project registration and promoter details.
Claim check: Checklist items and 7/30-day timelines are indicative industry practice, not statutory guarantees. Verify the OC, fire NOC, agreement plan, floor area, charges and registration entry in writing before signing the possession memo.